2015 Touring – STARTER – INSTALLATION

1. Verify that two ring dowels are installed in the primary chaincase or starter flange.

2. Lubricate O-ring on starter and bore of primary chaincase with light film of clean primary chaincase lubricant.

3. Apply a drop of LOCTITE 243 MEDIUM STRENGTH THREADLOCKER AND SEALANT (blue) to the starter mounting screws.

4. Install starter and start both mounting screws. Tighten to 22-24 ft-lbs (29.8-32.5 Nm).

5. Install engine oil filler cap/dipstick.

6. Install battery positive cable on stud of solenoid. Tighten to 70-90 in-lbs (7.9-10.2 Nm). Pull down rubber boot over terminal connections.

7. Install starter solenoid connector [128] at front of starter.

Do not over-tighten bolts on battery terminals. Use recommended torque values. Over-tightening battery terminal bolts could result in damage to battery terminals. (00216a)

8. Connect battery negative cable to battery. Tighten to 60-70 in-lbs (6.8-7.9 Nm).

9. Install seat. See 2.30 SEAT.

 

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *