It is assumed that each step performed on one cylinder is automatically repeated on the other.
To perform a complete top end overhaul, follow all steps listed in this section including inspection and repair procedures.
Twin-Cooled engine: Drain coolant and remove upper coolant lines prior to disassembly. See C.5 COOLING SYSTEM REPAIR.
Leave a Reply