2015 Touring – AUTOMATIC COMPRESSION RELEASE (ACR) – INSTALLATION

1. Verify that the copper seal washer is in place on the ACR.

2. See Figure 7-65. Identify a location around the threads of the ACR approximately 1/3 of the way up from the end.

3. See Figure 7-66. Apply three equally spaced dots of LOCTITE 246 MEDIUM STRENGTH/HIGH TEMPERATURE THREADLOCKER (blue) on threads.

4. To prevent cross threading, install and finger tighten.

5. See Figure 7-67. Using ACR SOLENOID SOCKET (Part No. HD-48498-A), tighten to 13-17 ft-lbs (17.6-23.0 Nm).

6. Route the wire harness between the cylinders.

7. Install rocker box and rocker cover. See 3.25 TOP END OVERHAUL: ASSEMBLY.

8. Mate the ACR connectors [203R] and [203F] to the main wiring harness. Secure connectors to retaining clip.

 

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *